skip to main content
US FlagAn official website of the United States government
dot gov icon
Official websites use .gov
A .gov website belongs to an official government organization in the United States.
https lock icon
Secure .gov websites use HTTPS
A lock ( lock ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.


Search for: All records

Creators/Authors contains: "Martínez-Ramón, Manel"

Note: When clicking on a Digital Object Identifier (DOI) number, you will be taken to an external site maintained by the publisher. Some full text articles may not yet be available without a charge during the embargo (administrative interval).
What is a DOI Number?

Some links on this page may take you to non-federal websites. Their policies may differ from this site.

  1. Electric load forecasting refers to forecasting the electricity demand at aggregated levels. Utilities use the predictions of this technique to keep a balance between electricity generation and consumption at each time and make accurate decision for power system planning, operations, and maintenance, etc. Based on prediction time horizon, electric load forecasting is classified to very short-term, short-term, medium-term, and long-term. In this paper, a multiple output Gaussian processes with multiple kernel learning is proposed to predict short-term electric load forecasting (predicting 24 load values for the next day) based on load, temperature, and dew point values of previous days. Mean absolute percentage error (MAPE) is used as a measure of prediction accuracy. By comparing MAPE values of the proposed method with the persistence method, it can been seen that the proposed method improves the persistence method MAPE up to 4%. 
    more » « less